Global Service is a contractor for drywall, interior and exterior finishes, insulation and painting. It works between Sondrio, Chiavenna and Lecco: Valtellina, Valchiavenna and Lake Como.
Much of that work ends up out of sight. Once the walls are closed and painted, the steel frame, the insulation and the pipes inside them can no longer be seen.
So the site tells each job the way it was built: one stage at a time, in the photos taken on site, from bare structure to the surface ready for paint.
What made it hard
- Showing what gets covered. The quality of drywall work is in the frame and the insulation, which the finished wall hides. The site had to show them before they are covered.
- Four trades, one team. A homeowner should see that one team handles drywall, insulation, finishes and paint.
- Photos from a building site. Shot on a phone, in every orientation, and heavy. They had to look right and load fast.
- Nothing to maintain. A new project arrives a few times a year, and adding one should not mean running a content system with logins and updates.
What shipped
- Home. One team, four trades, and the latest projects.
- Services. Each trade with what it covers, from partitions and false ceilings to the last coat of paint.
- Projects. A numbered list, filtered by type of job and by trade.
- A page per project. The facts of the job, then its stages in photos, then the next project.
- About. How a job runs, from the site visit and the quote to the handover, and the area the team covers.
How it works
A project is a list of stages. Each stage is a title, one sentence and its photos, in the order the work happened. On a desktop the title stays in place while its photos scroll past.
Photos keep their shape. A portrait shot takes one column and a landscape shot takes two, and neither is cropped. Every photo is resized and stripped of its metadata, and loads only when it is about to be seen.
Two filters. The list of projects filters by type of job, such as a new house or a renovation, or by trade, one at a time. On a phone the filters fold away until they are needed.
How we built it
- Day one. The structure, the two real projects with their stages, the Italian copy around the four trades, and the server.
- Day two. The site live, and added to Mont3's work.
- After. The real phone, email and VAT number, as soon as the client sent them.
Result
- A site that shows the inside of the walls: 2 projects told in 7 stages, through 32 photos from the sites.
- Four trades on one page, with the area the team covers.
- No cookie banner, because the site tracks nobody.
- A new project is a new entry in a file: no login, no plugin to update.
Stack
- Framework. Nuxt 4 and Vue 3, generated as a static site.
- Motion. GSAP and Lenis for the scrolling, with reduced motion respected.
- Content. Plain data files in the repository, no content system.
- Images. Resized and stripped by hand, lazy-loaded.
- Hosting. nginx, HTTPS from Let's Encrypt.
Article 036 · 16 November 2026 · 3 min read.
Reply to paolo@mont3.ch.